Our Process: Controlled Uniform Manufacturing Built for Scale
Repeatable production systems with in-line QA and dependable turnaround for enterprise uniform programs.
30+ years · Integrated production · Pan-India dispatch · GST-compliant invoicing
See how we align outputs to industries we serve for rollout-ready programs.
Scheduled runs with in-line QC checkpoints.
Consistent kitting and labeling for multi-site rollouts.
Fabric, branding, and packing managed in one workflow.
Our Manufacturing Process
A controlled, approval-driven flow that keeps specifications, QA, and dispatch on schedule. Typical lead times run 2–4 weeks depending on volume and season; capacity scales with locked checkpoints.
- 1Requirements & Specification FreezeLock fabrics, constructions, branding placements, sizing grids, and timelines with clear approvals.
- 2Sampling & Fit ValidationProduce fit and branding samples, verify measurements and colors, and capture sign-offs before bulk.
- 3Production Planning & Line SetupPlan capacity, sequence cutting/stitching/branding, and set checkpoints for critical-to-quality operations.
- 4In-Line QA & Corrective ControlRun in-line inspections, record variances, and implement corrective actions without halting schedules.
- 5Final Inspection, Kitting & DispatchInspect finished goods, kit/label per requirement, and schedule dispatch with documentation shared.
Process Flow
Linear, approval-led execution with QA and repeatability built into every stage.
Requirements & Program Scoping
Define scope, specs, timelines, and approvals with ownership and checkpoints agreed.
Sampling & Commercial Approval
Run fit/branding samples, validate costs and lead times, and capture sign-offs before bulk.
Fabric Sourcing & Production Planning
Reserve fabrics/trims, schedule lines, and sequence operations for predictable throughput.
Production with In-line Quality Checks
Execute cutting, stitching, branding with recorded in-line QC and corrective controls.
Kitting, Dispatch, and Rollout Coordination
Inspect, kit/label per requirement, and coordinate dispatch windows with status updates.
Capacity
Scalable lines for both sampling and bulk runs with quick turnarounds.
Machinery
Modern cutting, stitching, embroidery, and finishing setups.
QA Process
In-line checks plus final inspection before packing; fabric and color consistency tracked.
Turnaround
Typical lead times 2–4 weeks depending on order size and seasonality.